You are browsing the archive for BOM.

Copy Routing

 

  • Form Application: Bills of Material
  • Form Name: BOMFDRTG
  • Form Path: /oracle/apps/r12/visr12/apps/apps_st/appl/bom/12.0.0/forms/US/BOMFDRTG.fmx

Routing is a set of operations that will be performed in sequence to manufacture an assembly. Routing are setup against an assembly Item. Routings can be manually created or copied from another routing or commoned to another routing.
In this tutorial you will learn how to create a new routing by copying from another route. Copy routing functionality can be used to create either primary routing or alternate routing.

Copy Routing - Oracle Bills Of Material
Description
Routings can be created in different ways. In this tutorial you will learn how to Create Routing in Oracle BOM Module. For detailed tutorial visit http://oracleappscommunity.com/oracle/blog/2222/copy-routing/

Navigation: BOM responsibility -> Routings ->Routings

    • Enter the assembly item
    • Navigate to Tools -> Copy Routing From
    • Select the Inventory Organization
    • Select the Alternate code if copied from an alternate routing
    • Click ‘COPY’
    • Save the changes.

Once Routing is copied you can make any changes you need. Copy routing will improve the productivity.

 

Copy Routing

Copy Routing

Create Alternate Routing

 

  • Form Application: Bills of Material
  • Form Name: BOMFDRTG
  • Form Path: /oracle/apps/r12/visr12/apps/apps_st/appl/bom/12.0.0/forms/US/BOMFDRTG.fmx

Routing is a set of operations that will be performed in sequence to manufacture an assembly. Routings are setup against an assembly Item. Many times there is possibility of a different ways to manufacture the same assembly, in Oracle that is achieved by setting up ‘Alternate Routings’. Main difference between primary and alternate routing is it has alternate code associate it. One assembly can have as many as alternate routings.

In this tutorial you will learn how to setup alternate routing.

Create Alternate Routing - Oracle Bills Of Material
Description
Rounting controls the sequence of manufacturing operations. Sometimes a product can be manufactured in different ways, in Oracle BOM this can be setup a Alternate Routing for the same aassembly item.

Navigation: BOM responsibility -> Routings ->Routings

    • Enter the assembly item
    • Select the alternate code
    • Enter the Revision
    • Enter the revision effective date
    • Navigate to ‘OPERATIONS’
    • Enter the operation sequence
    • Enter the operation code or select the standard operation
    • If it is not standard operation then enter
      • Department, ,lead time, other operation details
    • Save the changes.
Create Alternate Routing

Create Alternate Routing

uy5bFdpk318

Setup Standard Operation

 

  • Form Application: Bills of Material
  • Form Name: BOMFDRSO
  • Form Path: /oracle/apps/r12/visr12/apps/apps_st/appl/bom/12.0.0/forms/US/BOMFDRSO.fmx

Standard Operations are used in WIP routings. Routing can have operations manually added or pre-defined operations can be used. Standard operations are like pre-defined frequently used operations. Standard Operation setup involves using a operation name and assigning all resources needed to do that operation.

Setup Standard Operations - Oracle Bill Of Material
Description
standard operations are reusable operations, once they are setup can be used in Routings. For more details on how to setup standard operations visit http://oracleappscommunity.com/oracle/blog/2176/setup-standard-operation/

Navigation:BOM responsibility -> Routings -> Standard Operations

  • Enter the operation ‘Code’
  • Enter the operation ‘Description’
  • Select the ‘Department’ in which this operation is performed.
  • Click on ‘Operation Resources’
  • Enter the resource ‘sequence’
  • Enter the resource (name) required for this operation
  • Enter the basis for resource charge – Item or Lot
  • Enter the usage amount i.e. no. of units of resource needed to complete the operation
  • Complete scheduling and costing details for the resource
  • Add additional resources if this operation requires more than one resource.

Save the changes.

Setup Standard Operations

Setup Standard Operations