2.1 Copy Bills Of Material

  • Form Application: Bills of Material
  • Form Name: BOMFDBOM
  • Form Path: /oracle/apps/r12/visr12/apps/apps_st/appl/bom/12.0.0/forms/US/BOMFDBOM.fmx

Bills Of Material (BOM) is a list of components required to manufacture its parent (assembly) item.

BOMs can be created several ways.

  • Creating manually
  • Copying BOM from another BOM
  • Creating common BOM across multiple organizations.

In this tutorial you will learn on how to Creating a BOM by copying from another BOM.

Navigation: BOM responsibility -> Bills -> Bills

  • Enter the assembly Item number for which BOM is setup
  • Click on ‘Tools’ -> Copy Bills From
  • Enter the ‘Organization’
  • Select the ‘Item’ to copy from
  • Select the Copy option – Current, Future and Current or All
  • Click on ‘Copy’
  • All the component information is copied from the referenced assembly item BOM.
  • Once copy is done any changes can be done manually.
  • Save the changes.
Copy Bills Of Material

Copy Bills Of Material

2.0 Create Bills Of Material

  • Form Application: Bills of Material
  • Form Name: BOMFDBOM
  • Form Path: /oracle/apps/r12/visr12/apps/apps_st/appl/bom/12.0.0/forms/US/BOMFDBOM.fmx

Bills Of Material (BOM) is a list of components required to manufacture its parent (assembly) item. To manufacture any assembly setting up BOM is critical. BOM doesn’t drive the manufacturing process, but it is a simple statement of list of material required. BOM is used by MRP/Supply chain planning to plan the components.

Navigation: BOM responsibility -> Bills -> Bills

  • Enter the assembly Item number for which BOM is setup
  • Select the BOM revision and effective date
  • Go to the ‘MAIN’ tab
  • Enter the ‘Item Sequence’
  • Enter the ‘Operation Sequence’ . Routing operations must be setup for this assembly prior to using operation sequence.
  • Enter the ‘Component’ item
  • Select the ‘Basis’ as Item or Lot. Lot basis means irrespective of WIP Job quantity same component quantity is needed. Item basis means it is the component quantity needed to manufacture ‘1’ quantity of assembly item.
  • Enter the ‘Component quantity’
  • Select the effective dates for the components
  • Select the planning percentages and yield
  • Check ‘Include in cost-rollup’ to include the component cost in assembly cost roll-up
  • Under ‘Material Control’ tab select the ‘Supply Type’.
    • PUSH – Manually issued to WIP Job
    • OPERATION PULL – Automatically back flushed when operation is completed
    • ASSEMBLY PULL – Automatically back flushed when assembly is completed
    • PHANTOM – This will be ignored, only sub-components of phantom item is considered
  • Navigate to next line to add more components.
  • Click ‘Save’ to save the BOM just now created.
  • Click on ‘Substitutes’ to add substitute components for each component material
  • Save the changes again.
Create Bills Of Material

Create Bills Of Material

 

9.0 Oracle Apps Bills Of Material Interview Questions

  1. BOM parameters: Explain maximum number of levels ?
  2. What is alternate bom ?
  3. What are the different types of resources ?
  4. How holidays are represented in a workday calendar ?
  5. What is common bills of material (BOM) ?
  6. Can you copy a BOM ?
  7. Explain reference designators ?
  8. Where do you setup substitute components
  9. What is a BOM revision ?
  10. How do you check BOM circular loops ?
  11. What is indented BOM ?
  12. How man levels of BOM you can define at a time ?
  13. What are different types of BOM ?
  14. In which module you setup Routing ?
  15. What is the difference between ‘Operation’ and ‘Standard Operation’ ?
  16. Can you delete a BOM ?
  17. What are deletion constraints ?
  18. Is it possible to have custom deletion constraints ?
  19. Explain the different between deletion constraint and delete statement ?
  20. Explain the components of a lead ?
  21. Where do you setup lead time ?
  22. Explain the difference between manufacturing and cumulative lead time ?
  23. What is Phantom routing ?