You are browsing the archive for Engineering Change Order Schedule Report.

3. Engineering Change Order Schedule Report

Report Short Code: ENGRCNSR

Report Name: Engineering Change Order Schedule Report

Module: Oracle Engineering

Report Summary: Engineering Change Order Schedule report prints the detail schedule pending ECO implementations based on scheduled implementation date of a given revised part.

Navigation:

Engineering -> Reports -> ECOs -> Select Report Name as ‘Engineering Change Order Schedule Report’

Engineering Change Order Schedule Report

Engineering Change Order Schedule Report

Report Parameters

  • Print components
  • Engineering Change Order Type
  • Engineering Change Order From
  • Engineering Change Order To
  • Effective Dates From
  • Effective Dates To
  • Revised Item Status
  • Display Option
  • Revised Item
  • Revised Component
  • Sort Criteria1
  • Sort Criteria2
  • Sort Criteria3

 

Report Output:

Report displays the schedule of ECO implementations for a revised part.

Engineering Change Order Schedule Report Output

Engineering Change Order Schedule Report Output