You are browsing the archive for Discrete Manufacturing.

2. Engineering Change Order Detail Report

Report Short Code: ENGRCNDR

Report Name: Engineering Change Order Detail Report

Module: Oracle Engineering

Report Summary: Engineering Change Order Detail report prints the details of a given ECO(s).

Navigation:

Engineering -> Reports -> ECOs -> Select Report Name as ‘Engineering Change Order Details Report’

Engineering Change Order Detail Report

Engineering Change Order Detail Report

 

Report Parameters

  • All organizations
  • Organization Hierarchy
  • Engineering Change Order From
  • Engineering Change Order To
  • Dates From
  • Dates To
  • Status
  • Additional Component detail
  • Order entry component detail

Report Output:

Report displays the details of all the ECOs that meets the given parameter criteria.

Engineering Change Order Detail Report Output

Engineering Change Order Detail Report Output

3.7 Purge ECOs

Purging Engineering Change Orders (ECO) permanently deletes the ECO information from the application. Each business can establish a retention policy after which ECO documents can be purged. Purging old documents reduces the storage space and improves the performance to query ECOs. Business can archive ECOs into data warehouse prior to purging.

Navigation: Engineering -> ECOs -> Delete

Concurrent Program ‘Engineering change order purge program’ opens up.

Enter the parameters

  • Change Order From
  • Change Order To
  • Include Implemented
  • Include Cancelled
  • Date
Purge ECOs

Purge ECOs

3.6 Transfer to Manufacturing

Transfer to Manufacturing screen is used to move any engineering item/BOM/routing into an manufacturing item/BOM/Routing. Main difference between ‘copy to manufacturing’ and ‘transfer to manufacturing’ is copy keeps the engineering item as it is and creates a new manufacturing item, where as transfer to manufacturing moves an item from engineering to manufacturing.

Navigation: Engineering -> Prototypes -> Transfer to Manufacturing

1) Enter the item

2) Select BOM/Routing if they also need to be transferred to manufacturing

3) Enter new revisions of transferred item.

Click ‘TRANSFER’ to transfer the item to manufacturing.

Transfer to Manufacturing

Transfer to Manufacturing