2. Engineering Change Order Detail Report

Report Short Code: ENGRCNDR

Report Name: Engineering Change Order Detail Report

Module: Oracle Engineering

Report Summary: Engineering Change Order Detail report prints the details of a given ECO(s).

Navigation:

Engineering -> Reports -> ECOs -> Select Report Name as ‘Engineering Change Order Details Report’

Engineering Change Order Detail Report

Engineering Change Order Detail Report

 

Report Parameters

  • All organizations
  • Organization Hierarchy
  • Engineering Change Order From
  • Engineering Change Order To
  • Dates From
  • Dates To
  • Status
  • Additional Component detail
  • Order entry component detail

Report Output:

Report displays the details of all the ECOs that meets the given parameter criteria.

Engineering Change Order Detail Report Output

Engineering Change Order Detail Report Output

Leave a reply

Your email address will not be published. Required fields are marked *