PROFILE OPTION SHORT CODE |
PROFILE OPTION NAME |
MSO_MAX_EXCESS_RESOURCE_UNITS |
MSO: Maximum Resource Over-capacity |
MSO_ORG_DMD_PENALTY |
MSO: Penalty Cost Factor for Late Org Demands Flexfield Attribute |
MSO_ORG_ITEM_PENALTY |
MSO: Penalty Cost Factor for Exceeding Org Material Capacity Flexfield Attribute |
MSO_ORG_RES_PENALTY |
MSO: Penalty Cost Factor for Exceeding Org Resource Capacity Flexfield Attribute |
MSO_ORG_TRSP_PENALTY |
MSO: Penalty Cost Factor for Exceeding Org Transportation Capacity Flexfield Attribute |
MSO_RES_PENALTY |
MSO: Penalty Cost Factor for Exceeding Resource Capacity Flexfield Attribute |
MSO_SCHEDULE_ACROSS_BREAKS |
MSO: Schedule Across Breaks |
MSO_SO_PENALTY |
MSO: Penalty Cost Factor for Late Sales Orders Flexfield Attribute |
MSO_SUP_CAP_PENALTY |
MSO: Penalty Cost Factor for Exceeding Material Capacity Flexfield Attribute |
MSO_TRSP_PENALTY |
MSO: Penalty Cost Factor for Exceeding Transportation Capacity Flexfield Attribute |
MSO_FIRM_SUPPLY_ALLOC_WIN |
MSO: Firm Supply Allocation Window (Backward days) |
MSO_MAX_PULL_OPERATION |
MSO: Maximum Number of Pull for Operation |
MSO_SCHEDULE_WINDOW_WIDTH |
MSO: Schedule window width |
MSO_DECIS_ISTRAT |
DECIS Sampling Strategy |
MSO_DECIS_NSAMPLES |
DECIS sample size |
MSO_DECIS_NZROWS |
DECIS number of row cuts |
MSO_DECIS_MAXIT |
DECIS number of Benders iterations |
MSO_DECIS_IWRITE |
DECIS output write flag |
MSO_DECIS_IBUG |
DECIS debug output detail |
MSO_DECIS_IRESAMP |
DECIS solution evaluation |
MSO_DECIS_IAPPR |
DECIS approximation function |
MSO_DECIS_IREG |
DECIS decomposition flag |
MSO_DECIS_RHO |
DECIS rho parameter |
MSO_DECIS_TOLBEN |
DECIS decomposition tolerance |
MSO_DECIS_TOLW |
DECIS nonzero tolerance |
MSO_NFL_CYCLE_TIME_COEFFICIENT |
MSO: Network routing cycle time coefficient |
MSO_NFL_FIXED_TIME_WINDOW |
MSO: Network routing fixed time window |
MSO_NFL_BACKWARD_COMPRESSION_PCT |
MSO: Nfl Backward Compression Pct |
MSO_NFL_FORWARD_COMPRESSION_PCT |
MSO: Nfl Forward Compression Pct |
MSO_CPX_PARAM_PREIND |
MSO: Preprocessing Flag for LP Matrix |
MSO_CPX_PARAM_EPMRK |
MSO: LP Markowitz Coefficient |
MSO_CPX_PARAM_AGGFILL |
MSO: Preprocessing Aggregator Fill |
MSO_CPX_PARAM_AGGIND |
MSO: Preprocessing Aggregator Limit |
MSO_CPX_PARAM_DEPIND |
MSO: Check Redundant Constraints |
MSO_CPX_DUAL |
MSO: Solve Dual Problem |
MSO_PARAM_PPRIIND |
MSO: Primal Simplex Parameter |
MSO_CPX_PARAM_DPRIIND |
MSO: Dual Simplex Parameter |
MSO_CPX_PARAM_EPOPT |
MSO: Simplex Optimality Tolerance |
MSO_CPX_PARAM_EPPER |
MSO: Simplex Perturbation Constant |
MSO_CPX_PARAM_EPRHS |
MSO: Simplex Feasibility Tolerance |
MSO_CPX_PARAM_ITLIM |
MSO: Maximum Simplex Iterations |
MSO_CPX_PARAM_PREPASS |
MSO: Simplex Presolve Limit |
MSO_CPX_PARAM_PRICELIM |
MSO: List Size for Pricing Candidates |
MSO_CPX_PARAM_SINGLIM |
MSO: Simplex Singularity Repair Limit |
MSO_CPX_PARAM_TILIM |
MSO: Global Time Limit |
MSO_CPX_PARAM_SCAIND |
MSO: CPLEX Scaling Factor |
MSO_CPX_PARAM_CRAIND |
MSO: CPLEX Crash Parameter |
MSO_CPX_PARAM_REINV |
MSO: CPLEX Refactor Rate |
MSO_SCO_ALT_PROCESS_PENALTY |
MSO: Alternate Process Penalty |
MSO_SCO_SUB_ITEM_PENALTY |
MSO: Substitute Item Penalty |
MSO_SCO_ALT_RESOURCE_PENALTY |
MSO: Alternate Resource Penalty |
MSO_SCO_ALT_SOURCE_PENALTY |
MSO: Alternate Source Penalty |
MSO_SCO_LEAD_TIME_FACTOR |
MSO: Queue Time Factor |
MSO_MAXIMUM_PREPONES |
MSO: Maximium Number of Prepones |
MSO_CPX_PARAM_PERLIM |
MSO: Simplex Perturbation Limit |
MSO_SCO_REDCOST_TOL |
MSO: SCO Reduced Cost Tolerance |
MSO_SCO_DUALVAR_TOL |
MSO: SCO Dual Variables Tolerance |
MSO_SPLIT_PO_THRESHOLD |
MSO: Demand Size Tolerance Before Splitting Planned Orders |
MSO_DEMAND_WIN |
MSO: Demand Window Size |
MSO_HLS_MAX_OPERATIONS_PER_SLICE |
MSO: Maximum Operations Per Slice |
MSO_SUPPLY_FOR_SUBSTITUTE |
MSO: Choice of supply for substitution |
MSO_USE_BREAKS_IN_UNCONSTRAINED |
MSO: Use Breaks in Calculation of Unconstrained Scheduling Windows |
MSO_RESOURCE_CONSUMPTION_PERCENTAGE |
MSO: Capacity Units Recalculation Threshold |
MSO_EDD_SCHEDULING_WINDOW_CONTROL |
MSO: EDD Scheduling Window Control |
MSO_GENERATE_SHARED_SUPPLY_EXCEPTIONS |
MSO: Generate Shared Supply Exceptions |
MSO_ENHANCED_RIGHT_JUSTIFY |
MSO: Allow Schedule Gaps for Shared Supplies |
MSO_RESCHEDULE_JOBS_OUT |
MSO: Reschedule Jobs Out to Reduce Inventory Carrying Costs |
MSO_PULL_PUSH_BASE |
MSO: Pull push base |
MSO_CPX_PARAM_ADVIND |
MSO: Optimization Advanced Start |
MSO_SCO_RES_ADJ_FACTOR |
MSO: Resource Adjustment Factor For Improved Offloading to Alternates |
MSO_HEURISTIC_TYPE |
MSO: Heuristic type |
MSO_SCHEDULE_FIRMED_BEFORE_PTF |
MSO: Firm Work Orders/Operations Within Time Fence |
MSO_BATCHABLE_FLAG |
MSO: Global Batchable Flag |
MSO_USE_SCO_INT_TIMEAGGREG |
MSO: Use SCO Time Aggregation |
MSO_SCO_AGGREG_WEEK_BUCKETS |
MSO: Optimization Weekly Aggregation Buckets |
MSO_CALCULATE_CONSTRAINT_EXCEPTIONS |
MSO: Calculate Constraint Exceptions |
MSO_HLS_GRANULAR_PRECISION |
MSO: Floating Point Precision for Planning Bucket Efficiency |
MSO_PARTIAL_DEMAND_COMPLETION |
MSO: Allow Partial Demand Completion |
MSO_BATCHING_STRATEGY |
MSO: Resource Batching Strategy |
MSO_HLS_USAGE_PRECISION |
MSO: Floating Point Precision for Usage in Routings |
MSO_HLS_ACTIVITY_DURATION_MAX |
MSO: Maximum Activity Duration |
MSO_BATCHING_BEST_EFFORT |
MSO: Reschedule Shared Supply to Influence Batching |
MSO_HLS_TRANS_VOLUME_PRECISION |
MSO: Floating Point Precision for Transportation Capacities (Volume) |
MSO_FIRM_SUPPLY_MULTIPLIER |
MSO: Multiplier To Derive Supply Allocation Window |
MSO_SUPPLY_WIN |
MSO: Supply Window Size |
MSO_MAX_NUMBER_OF_RESCHEDULES |
MSO: Additional Demand Slices for Shared Supply Rescheduling |
MSO_FIRM_B4_PO |
MSO: Net All Firm Supplies Before Creating Planned Order |
MSO_SCO_PREPROC_REDUCTION |
MSO: Primal/Dual Preprocessing Reduction |
MSO_BATCHING_TYPE |
MSO: Batching Precision |
MSO_ENABLE_DECISION_RULES |
MSO: Enable Decision Rules |
MSO_CARRYING_COST_PCT |
MSO: Inventory Carrying Costs Percentage |
MSO_DEFAULT_FORECAST_PRIORITY |
MSO: Default Forecast Priority |
MSO_DEMANDS_PER_GROUP |
MSO: Maximum Demands per Group |
MSO_FCST_PENALTY |
MSO: Penalty Cost Factor for Late Forecasts Flexfield Attribute |
MSO_FLOATING_POINT_PRECISION |
MSO: Floating Point Precision for Order Quantities |
MSO_GLOBAL_DMD_PENALTY |
MSO: Penalty Cost Factor for Late Demands |
MSO_GLOBAL_ITEM_PENALTY |
MSO: Penalty Cost Factor for Exceeding Material Capacity |
MSO_GLOBAL_RES_PENALTY |
MSO: Penalty Cost Factor for Exceeding Resource Capacity |
MSO_ITEM_CAP_PENALTY |
MSO: Penalty Cost Factor for Exceeding Item Material Capacity Flexfield Attribute |
MSO_ITEM_DMD_PENALTY |
MSO: Penalty Cost Factor for Late Item Demands Flexfield Attribute |
MSO_LINE_RESOURCE_GROUP |
MSO: Resource Group for the Line Flexfield Attribute |
MSO_MAX_DAYS_LATE |
MSO: Maximum Allowable Days Late |
MSO_MTQ_ACROSS_ORGS |
MSO: Continuous transfer across organizations |
MSO_INTRA_ORG_SUPPLY_SPLIT |
MSO: Divergent Supply Feeding Pattern for Intra-Org Sourced orders |
MSO_INTER_ORG_SUPPLY_SPLIT |
MSO: Divergent Supply Feeding Pattern for Inter-Org and Supplier Sourced orders |
MSO_INTRA_ORG_DEMAND_SPLIT |
MSO: Convergent Supplies Consumption Pattern for Intra-Org Sourced orders |
MSO_INTER_ORG_DEMAND_SPLIT |
MSO: Convergent Supplies Consumption Pattern for Inter-Org and Supplier Sourced orders |
MSO_MAXIMIZE_SEARCH_OF_AVAILABILITY_INTERVALS |
MSO: Maximize Search of Availability Intervals |
MSO_ENFORCE_RESOURCE_SEQUENCE_CONTIGUITY |
MSO: Enforce Resource Sequence Contiguity |
MSO_USE_OF_ASSIGNED_UNITS_IN_SCHEDULING |
MSO: Use Of Assigned Units In Scheduling |
MSO_FIRM_PURCHASE_ORDER_WITHIN_PTF |
MSO: Firm Purchase Orders Within Time Fence |
MSO_FIRM_REQ_WITHIN_PTF |
MSO: Firm Requisitions Within Time Fence |
MSO_SCO_NUM_THREADS |
MSO: Number of Threads for Optimization |
MSO_SLACK_HOURS_FOR_BATCH_RESOURCE |
MSO: Slack Hours For Batch Resource |
MSO_SCO_ASSIGNED_UNITS |
MSO: Split Planned Orders for Assigned Units |
MSO_DEFAULT_TIMESTAMP_SFTSTCK |
MSO: Default Timestamp Safety Stocks |
MSO_GENERATE_COMPRESSION_EXCEPTION |
MSO: Generate Compression Days Exception |
MSO_CPX_PARAM_BARALG |
MSO: Barrier Optimizer Algorithm Choice |
MSO_USE_SHIFT_TIMES_IN_LEAD_TIME_SCHEDULING |
MSO: Use Shift Definitions When Scheduling Lead Times |
MSO_MAX_PUSH_OPERATION |
MSO: Maximum Number of Pushes for Operation |
MSO_SCO_INT_DMD_AGGR |
MSO: Internal Demand Aggregation Within Optimization |
MSO_LP_ALGORITHM |
MSO: LP Optimization Algorithm |
MSO_DEFAULT_SO_PRIORITY |
MSO: Default Sales Order Priority |
MSO_DEMANDS_PER_SLICE |
MSO: Maximum Demands per Slice |
MSO_CPX_PARAM_PERIND |
MSO: Simplex Perturbation Parameter |
MSO_HLS_FLAT_FILES_PATH |
MSO: HLS flat files path |
MSO_SCO_ALLOCATION_WINDOW |
MSO: Sourcing Allocation Window |
MSO_HLS_TRANS_WEIGHT_PRECISION |
MSO: Floating Point Precision for Transportation Capacities (Weight) |
MSO_SCO_AGGREG_DAY_BUCKETS |
MSO: Optimization Daily Aggregation Buckets |
MSO_LEAD_TIME_CONTROL |
MSO: Lead Time Control |
MSO_PULL_PUSH_OFFSET |
MSO: Pull push offset |
MSO_SCO_MAX_DEMAND_GROUPS |
MSO: Number of Demand Groups for Optimization |
MSO_SCO_SPREAD_RESOURCE |
MSO: Spread Resource Consumption Within Optimization |
MSO_SCO_COST_ROLLUP |
MSO: Enable Cost Rollup for Optimization |
MSO_AVOID_NON_WRKNG_DAY_BUY_AND_TFR |
MSO: Avoid non working days for Buy/Transfer order dates |
MSO_SDS_ALTRES_SELECTION |
MSO: Alternate Resource Selection Method |
MSO_SUB_HORIZON_CYCLE_FOR_HLS_SDS |
MSO: Setup Pattern Calculation Window |
MSO_SIMULTANEOUS_RESOURCE_OVERLAP_MODE |
MSO: Allow Simultaneous Resource To End At Different Time |
MSO_SCHEDULE_ACROSS_BREAKS_FOR_SIM_RES |
MSO: Schedule Simultaneous Resources Across Breaks |
MSO_ALLOW_SIM_RES_TO_END_DIFF_TIMES |
MSO: Allow Simultaneous Resources to End at Different Times |
MSO_SCO_MAXIMIZE_POWO |
MSO: Maximize Use of Unfirm PurchOrd/WorkOrd in Optimization |
MSO_CPX_PARAM_SCRIND |
MSO: CPLEX messages to screen indicator |
MSO_SCO_EXIST_SUPP_ABR_SUBSCOMP |
MSO: Use Existing Supplies in Alternate BOM/Subs. Comp |
MSO_NUM_OF_PROCS |
MSO: Number of processes for Inline Forecast |
MSO_SCO_COMP_OFFSET_LOGIC |
MSO: Component offset logic for optimization |
MSO_USE_SAFETY_LEAD_TIME |
MSO: Use Safety Lead Time |
MSO_MIN_PROC_LEAD_TIME_ADJ_FACTOR |
MSO: Minimum Processing Lead Time Adjustment Factor |
MSO_NO_INFER_IN_ITEMSUBST |
MSO: Disable Inference of Item Substitution Relationship |
MSO_USE_EFCDATE_FOR_PRIO_IN_ITEMSUBST |
MSO: Use Effectivity Date to Infer End Item Substitution Priority |
MSO_HARD_LINK_MAX_OFFSET_UPPERBOUND |
MSO: Upper Limit for Maximum Time Offset for Hard Links |
MSO_HARD_LINK_TRANSFER_QUANTITY_THRESHOLD |
MSO: Transfer Quantity Threshold for Enforceing Hard Links |
MSO_MAX_DEMANDS_PER_HLK_DEMAND_SET |
MSO: Maximum Number of Demands in a Hard Linked Demand Set |
MSO_ENABLE_ROUNDING_OF_FRACTIONAL_SUPPLIES_FOR_SRP |
MSO: Enable Rounding of Fractional Supplies For Service Planning |
MSO_RESPECT_SUPPLY_TOLERANCES |
MSO: Delay Fulfillment of Small Demands |
MSO_EDD_DEMAND_CUTOFF_PRIORITY |
MSO: EDD Demand Cutoff Priority |
MSO_FORECASTER_WRITE_FLATFILE |
MSO: Write Inline forecasting flat files |
MSO_SPLIT_SUPPLIES_FOR_RELEASE |
MSO: Split Supplies for SPP Release |
MSO_USE_DECOMPOSITION |
MSO: Use Decomposition in Optimization |
MSO_DECOMPOSITION_TOTAL_PROCESSES |
MSO: Number of Processes to use in Decomposition |
MSO_SCO_COST_ROLLUP_INCR_FACTOR |
MSO: Cost Roll-up incremental factor |
MSO_GENERATE_COMPRESSION_FIRMING_EXCEPTIONS |
MSO: Generate Compression/Firming Exceptions for Orders in Progress |