You are browsing the archive for ENG.

10. ECO Deletion Constraints

Deletion Constraints are additional rules that system validates before deleting any master objects like ITEMs, BOMs, ROUTINGs and ECOs.

Some deletion constraints are seeded (comes out of box), each business can add/impose additional constraints.

Navigation: Engineering -> Setups -> Deletion Constraints

1) Constraint: Name of the deletion constraint

2) Description: Meaningful description of the deletion constraint

3) Delete Entity: Select the object to be deleted, Eg. Items, Boms, Routings, ECOs

4) SQL Statement: Validation logic that system should execute before deletion

5) Delete if: You can select either “No Rows found” or “Rows found”, this is based on SQL statement written above.

6) Failure Message: If deletion constraint met and can’t be deleted, then what should be the message to be displayed.

Deletion Constarints

Deletion Constarints

 

9. ECO Material Dispositions

ECO Material Disposition Codes are setup in Oracle Engineering module. These codes are used for updating dispositions on Engineering Change Orders (ECO). Material Disposition Codes are extensible lookup codes that means they comes with some seeded (out of the box/standard) values and each business can add new codes to it as required.

Navigation: Engineering -> Setups -> Material Dispositions

Enter the Code, Meaning, description of new lookup values. Check enabled flag to activate the lookup code.

ECO Material Dispositions

ECO Material Dispositions

5. ECO Approval List

Engineering Change Order (ECO) Approval List are defined through ‘Setup’ and later attached to ECOs for controlling who can approve ECOs.

Navigation: Engineering -> Setups -> Approval List

1) List: Enter ECO Approval List name

2) Description: Enter meaningful description of ECO approval list

3) Inactive On: Enter end date after which the ECO list will become inactive

4) Seq: Sequence of approver

5) Employee: Approver name

6) Description: Employee description

7) Inactive on: End date any approver from the list without end dating the entire approval list.

ECO Approval List

ECO Approval List