9.0 Oracle Apps Bills Of Material Interview Questions
- BOM parameters: Explain maximum number of levels ?
- What is alternate bom ?
- What are the different types of resources ?
- How holidays are represented in a workday calendar ?
- What is common bills of material (BOM) ?
- Can you copy a BOM ?
- Explain reference designators ?
- Where do you setup substitute components
- What is a BOM revision ?
- How do you check BOM circular loops ?
- What is indented BOM ?
- How man levels of BOM you can define at a time ?
- What are different types of BOM ?
- In which module you setup Routing ?
- What is the difference between ‘Operation’ and ‘Standard Operation’ ?
- Can you delete a BOM ?
- What are deletion constraints ?
- Is it possible to have custom deletion constraints ?
- Explain the different between deletion constraint and delete statement ?
- Explain the components of a lead ?
- Where do you setup lead time ?
- Explain the difference between manufacturing and cumulative lead time ?
- What is Phantom routing ?
Tags: BOM, oracle apps interview questions