7. Engineering Change Order Types Report
Report Short Code: ENGRECOT
Report Name: Engineering Change Order Types Report
Module: Oracle Engineering
Report Summary: Engineering Change Order Reasons Report prints all the ECO Types setup in Oracle Engineering module.
Navigation:
Engineering -> Reports -> Setups -> Select Report Name as ‘Engineering Change Order Types Report’
Report Parameters
This report don’t have any parameters. It prints all the ECO Types setup in oracle engineering.
Report Output:
Report displays the ECO Types setup in Oracle Engineering.
Leave a reply