You are browsing the archive for Engineering Change Order Types Report.

7. Engineering Change Order Types Report

Report Short Code: ENGRECOT
Report Name: Engineering Change Order Types Report
Module: Oracle Engineering

Report Summary: Engineering Change Order Reasons Report prints all the ECO Types setup in Oracle Engineering module.

Navigation:

Engineering -> Reports -> Setups -> Select Report Name as ‘Engineering Change Order Types Report’

 

Engineering Change Order Types Report
Engineering Change Order Types Report

 

Report Parameters

This report don’t have any parameters. It prints all the ECO Types setup in oracle engineering.

 

Report Output:

Report displays the ECO Types setup in Oracle Engineering.

Engineering Change Order Types Report Output

Engineering Change Order Types Report Output